A dispute has arisen on the border of the two countries regarding the welcome board of the India-Nepal motor bridge built on the Kali river near Dharchula in Pithoragarh district of Uttarakhand. Nepal has expressed objection to the name of village ‘Chharchhum’ in Indian territory being written on the board installed on the Nepal side of the bridge. The Nepali side says that the board installed on Nepal’s land should not have the Indian address but the name of the concerned area of Nepal. India has borne the entire expense of this bridge, built at a cost of Rs 32.98 crore, while its other end is in Nepal. After objection, the name has been covered from the Indian side. Since there was no motor bridge to go from Pithoragarh to Nepal, people had to go to Banbasa, about 200 kilometers away. This increased both time and expense. After the opening of Chharchum bridge, road connectivity from Dharchula to the border areas of Nepal will be easy and along with traffic, business activities are also expected to get a boost. Two pictures related to the controversy – Complete news in 5 points… 1. Controversy on the board before inauguration – The motor bridge connecting India and Nepal on the Kali River near Charchhum in Dharchula, Pithoragarh is ready. A controversy has arisen over the welcome board installed on the Nepal side before the start of operations. Objection has been raised at the local level over the name of village ‘Chharchum’ in Indian territory being written on the board installed in the Nepalese part. 2. Objection to writing the name of an Indian village in the Nepali part – ‘Kali Nadi, Chharchhum’ is written on the ‘Welcome to Nepal’ board on the Nepal side. Local citizens and political parties of Nepal have expressed their objection to this and demanded to write the name of Nepali region on the board. On the Nepal side, the address of this place has been given as Mahakali Municipality-8, Asigada, Darchula. Information about the matter has also been given to Nepal’s Foreign Ministry and District Administration. 3. After the objection, the Indian side gave assurance of reform – After the objection at the local level, it has come to light that the Indian side has given assurance of reform in the board. According to Dharchula SDM Ashish Joshi, the name of the Indian village has been covered in the board facing Nepal. There are preparations to install a new board recording the name of the local area of Nepal. 4. Foundation stone laid in 2022, cost of ₹ 32.98 crore – The foundation stone of this approximately 110 meter long motor bridge built on Kali River in Malla Charchhum was laid in September 2022. Its construction cost is Rs 32 crore 98 lakh. According to the Indian government, in February 2022, an agreement was signed between India and Nepal to build a motorable bridge on the Mahakali River. The financial support of the project has been done under the grant-in-aid of the Government of India. 5. 200 KM round trip will be saved, business will also get boost – Due to lack of motor bridge between India and Nepal in Pithoragarh district, people had to go to Banbasa, about 200 kilometers away, to go to Nepal by vehicles. After the opening of Chharchum bridge, road connectivity from Dharchula to the border areas of Nepal will be easy. This is expected to reduce travel time and expenses and also boost business activities. Pithoragarh has about 275 km long border with Nepal and there are 10 international suspension bridges in the district for movement between the two countries. ————————————– Also read this news… Four-storey building inside the tunnel, workers trapped without oxygen: Mount Everest conquerors engaged in rescue; Somewhere I found a headless body, somewhere only legs. When I entered the tunnel for rescue, I started sinking into the swamp. The more it moved, the more it sank. Then I realized that the land itself was swallowing me. I was buried up to my waist. It took about 1 hour to get out. What I saw in this tunnel of Rasuwa was never experienced before. Mountain guide Vikram Karke, who is telling this, is part of the ongoing rescue operation in the tunnel of Rasuwa. They are involved in the rescue of Chilime, Trishuli-1 and Trishuli-3 A tunnels, where more than 100 people are trapped. Rescue teams from many countries including Nepal and Indian Army have gathered to rescue them. Describing the condition inside the tunnel, Vikram says, ‘Without machines it is difficult to reach the people trapped here. Vikram told us the whole story of the rescue…(Read full news)
Source link
[ad_3]
Daily Latest News